|
3-Phased Approach
Brighton uses a three Phased Approach for Documentation Simplification and System
Integration
-
Pre-Assessment Review (PAR) -- Definition of opportunity, Readiness and Scope
• Time Required: 2-3 days
-
Proof of Concepts -- Initial Redesign, Documentation Guidelines, Pilot Testing,
Change Control and Implementation
• Time Required: 8-13 weeks
-
Redesign & Harmonization – Redesign and harmonize remaining documents,
Pilot Testing, Change Control and Implementation
• Time Required: 13-16 weeks
The Benefits
See results following a thoroughly assessing and challenging of the current documentation
-- then simplifying and eliminating all unnecessary, superfluous and redundant content
that was not required for process control or cGMP reasons.
Reductions
|
Documents
|
10 - 25%
|
|
Pages
|
30 - 50%
|
|
Entries
|
30 - 60%
|
|
|